Step-by-step process for container approval

Setting up a container can be used for construction projects, storage purposes or as living space. But which permits are required? In this blog, you will learn which regulations apply, which steps must be followed and how the requirements differ depending on the type of container.

Check local regulations

  • Find out about the applicable Landesbauordnung and possible restrictions due to local development plans.
  • Requirements can vary significantly — check them thoroughly.

Contacting the competent authority

  • that Building regulations office Your municipality is the first point of contact to clarify the specific requirements.

Make a preliminary building request

  • Submit a preliminary building request to get clarity about the eligibility of your project for approval at an early stage.

Building application: You need these documents

Important documents

  • Building application form: Signed by client and design author.
  • Site plan: Corridor map with container marking.
  • construction drawings: Floor plans, sections and views on a scale of 1:100.
  • Building description: Technical details, materials and intended use.
  • Evidence of stability and energy efficiency.
container house

Special requirements

  • Drainage plan: Information on water supply and sanitation.
  • Neighbor's Approval: If neighboring rights could be affected.
  • Statistical survey form: For construction activity statistics.

Submitting the application

  • The complete application is submitted to the responsible building inspectorate.
  • As a rule, the documents must be submitted in triplicate.
Building permit for sea containers

Regional features in Saxony and the surrounding area

The installation of containers in Saxony is subject to the regulations of the Saxon Building Code (SächsBO). This regulates that construction facilities, such as containers, are generally subject to approval, provided that they are used permanently. Here are some regional examples and specific information from Saxony:

dresden

  • Building Supervision Office: In Dresden, the Building Supervision Office is the central point of contact for permits. Building applications must be submitted formally. The relevant forms are provided by the Saxon State Ministry of the Interior.
  • Temporary containers on public land: When containers are set up on public areas, such as roads or sidewalks, a traffic law order or exemption permit is required.some text
    • The applicant is responsible for the road safety obligation.
    • If necessary, a specialist company must be commissioned to provide proper signs.

leipzig

  • Building regulations: In Leipzig, too, a permit is required for the permanent installation of containers. The exact requirements depend on the intended use of the container and local development plans.
  • Contact points: The contact persons can be found at the local building regulations office.

Used container

General information for Saxony

  • Preliminary building request: In order to clarify the eligibility of a project for approval at an early stage, preliminary building inquiries can be submitted to the competent authorities.
  • Special use permit: Containers that are set up on public areas usually require a special use permit. This applies, for example, to sidewalks or parking areas.

Differences in processing times

  • In dresden It usually takes time to process a building application two to three months. For temporary use on public spaces, the processing time can be reduced to a few weeks.
  • In other cities, such as Leipzig, the processing time may vary depending on the complexity of the project.

Overview of approval requirements

container type
Approval required?
specifics
usually not necessary
Special use permit required for public property.
yes
Requiring approval, as they are considered permanent structures. Requirements: Stability, energy efficiency, development plans.
yes
Comprehensive building regulations such as energy efficiency and fire protection.
yes
Depending on the type of use as a building or vehicle. Review development plans. Requiring approval, as they are regarded as residential buildings.Additional requirements: development plan requirements (e.g. spacing areas) .Energy efficiency, fire protection and statics. Tiny houses on wheels: Special permit required if set up permanently.
All content is based on 2024 research
m3 Patrick Schmieder

Your contact for office containers

Patrick Schmieder
Managing Director, Sales, Special Construction Project Management

In order for us to be able to provide you with the right offer, we need:
type of container. quality requirements. number of pieces. Delivery address and special delivery conditions.
No items found.

Let's start your project!

Setting up a container requires careful planning and compliance with regional regulations. Whether for temporary use, storage purposes or as a residential solution — you can avoid delays by coordinating with the authorities at an early stage and submitting complete documents. Use this guide to successfully and legally implement your container project.